Mechanical envelope
Both thread standards, engagement depth, overall height, cable exit, deflection and clearance at maximum load.
S-beam engineering
Omega, Zemic, Revere & other S-beams. Use the application and original drawing to define your selection.
The SBM entries below are candidate families for review. Thread, height, mV/V and cable pinout remain unverified until the capacity-specific original and candidate datasheets have been compared. No row is an approved drop-in replacement.
| Original brand / part | SBM review candidate | Thread | Height / datum | Rated mV/V | Cable pinout |
|---|---|---|---|---|---|
| Omega LC101 / LC103B / LC111 | SBM-BSS / SBM-BSA / SBM-UTM | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Zemic H3 / B3G | SBM-BSS / SBM-BSA | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Zemic H3-N10-20K-6YB · 20,000 lb | SBM-BSS / SBM-BSA heavy-capacity review | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Revere BSS / BSA | SBM-BSS / SBM-BSA | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Celtron STC | SBM-BSA / SBM-BSS | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| FUTEK LSB200 / LSB205 | SBM-JR | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Interface SM / SSM | SBM-JR / SBM-UTM | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
| Rice Lake RL20000 | SBM-BSS / SBM-BSA | Drawing required | Drawing required | Confirm exact variant | Confirm wiring sheet |
Both thread standards, engagement depth, overall height, cable exit, deflection and clearance at maximum load.
Rated sensitivity, excitation, resistance, signal polarity and wiring. Wire colors are not universal.
Working and overload direction, sealing, fatigue exposure and calibration. Third-party names do not imply affiliation.
Capacity, direction, threads, end fittings and the readout should be reviewed together.
Send your requirements